Ash Pipe Bridge and Pipeline

Scope It included the Detail shop drawings, Fabrication and Installation of a Pipe Bridge and pipeline for transport of Ash slurry to the sites Ash storage facility

Value $750,000      Completion

Portfolio Categories:

Fabrication Installation Power Generator